window-furnishings-Promotion

UPGRADE AND SAVE ON WINDOW Furnishings

We know so well that new home selections can be complicated and choosing products like window furnishings might not feel like a priority. In fact, there is normally an 8-10 week lead time on window coverings so leaving the decision until after you move in could potentially mean living without curtains or blinds for weeks on end. Not only is this inconvenient but all that extra sunlight for that period, can potentially discolour or damage your new flooring and furniture.

Thynk Selection Process

THYNK Studio has a large and beautiful selection of window furnishings, from plantation shutters and roller blinds, to sheer or block out curtains. Not only can you choose your flooring and tiles with us, but if you choose your window furnishings too, we can make sure they’re installed within days of handover.

We’ll also sweeten the deal by offering $100 off your window coverings order, for every $1000 you spend on flooring and tiling upgrades.

Don’t worry THYNK has got them covered, with tiles, flooring and windows. Beautiful products, great prices and convenient installation. Talk to your design consultant about this offer, at your appointment.

Terms and conditions
• Receive $100 towards window furnishings order, for every $1000 you spend with us in upgrades

• Offer runs 12:00 AET 1st June 2021 until 12;00 AET 31st December 2021

• Upgrade product inclusions all tiles, carpet, laminate, hybrid, engineered timber, timber flooring

• Window coverings include all blinds, shutters and curtains

• Payment in full for window coverings order, required at the time of ordering

• No rainchecks or holds

• Discounts and savings are off the recommended retail price and sell prices shown are net of any discount or saving

• Products may vary from showroom to showroom

• *Promotion only available at THYNK studios that stock window furnishings.

• Window coverings will be installed within one week of handover

• Production and installation lead times

– Blinds 2 weeks
– Shutters 8 Weeks
– Curtains 4 Weeks
– Verishade 4 weeks